Iridium Epoch Halftime Rollover

The purpose of this advisory is to provide information about the Iridium Time (IRT) Epoch Halftime event. This notification is to assure OTT HydroMet customers who use Iridium Time in their applications that the logger will function properly before and after the upcoming halftime event on June 25, 2020 at 13:29.21 UTC. During prior Iridium Halftime transitions, Iridium has noted that some partners were using the IRT in a manner that might cause issues when signed instead of unsigned when 32-bit integer variables are used.  Also note that this is a ‘mid-epoch’ or ‘Halftime’ rollover and not a true ‘full epoch’ rollover.

OTT HydroMet has validated that the current SUTRON Loggers including:

  • SatLink 3
  • XLink 100 / 500
  • 9210
  • IridiumLink
  • Xpert
  • 8310
  • 7310

All handle the ‘halftime transition’ properly as they all use the necessary unsigned 32-bit arithmetic.  There is no action necessary for the customer that is using Iridium with OTT HydroMet loggers.

 

More info on the SUTRON Loggers:

You might also like these articles

River level monitoring lowers bridge scour risk

Engineers at Transport Scotland have investigated the potential for water level monitoring systems to help mitigate risks where transport infrastructure interacts with moving water. The trial was conducted at a bridge...
HydrologyMeteorology
Weather station Lufft WS600 at solar PV plant.

Building an Effective Meteorological Station for Solar PV

Weather conditions have a huge influence on photovoltaic output. Even intermittent cloud cover can have a dramatic effect on incident solar energy, while other factors like air temperature, wind direction...
MeteorologySolar Energy
DustIQ Soiling Sensor next to PV modules

Soiling Sensor DustIQ: Firmware Update Improves Response and Handling

The pioneering soiling monitoring system Kipp & Zonen DustIQ is becoming even better. From now on, OTT HydroMet provides the DustIQ with a new firmware that simplifies both handling and...
Solar Energy